Priced tight.
Scheduled. Verified.
One PO for the entire exhaust scope. Submittal turnaround on the clock. A field rep on site when the load shows up, and again when commissioning starts.
- Response Time
- Same-Day Technical Support
- Field Support
- On-Site Pre-Install Walk-Throughs
- Bid Accuracy
- Guaranteed Take-Off Precision
- Installation Efficiency
- Factory-Built Modular Assemblies
From bid day to close-out.
The same six steps on every job, with the deliverable named at each one so nobody has to ask where the submittal is.
Step One
Bid Day
Take-off review against the spec. Apples-to-apples pricing with options clearly tagged, so you can see exactly where an alternate saves money and where it costs you a code variance.
- Take-off in 48 hours
- Priced alternates
- Spec compliance notes
Step Two
Award
A single PO covers the full exhaust scope: duct, fans, dampers, supports, accessories and terminations. One vendor, one schedule, one point of accountability.
- Single PO
- Scope letter
- Named project contact
Step Three
Submittal
Stamped drawings, cut sheets and bill of materials back in five business days, with UL listings and NFPA 96 references cited on the sheet the reviewer is holding.
- Stamped drawings
- Cut sheets
- BOM
- Listing letters
Step Four
Release
Factory release is tied to your install date, not our quarter. No early stock-and-store fees, no late deliveries that push your crew to another floor.
- Release schedule
- Freight plan
- Delivery window
Step Five
Install
Pre-install survey of the shaft, roof curb and clearances before the load arrives. Weekly check-ins while the crew is up, and change-order discipline when conditions differ from the drawings.
- Pre-install survey
- Weekly check-ins
- Field rep on site
Step Six
Close-Out
Commissioning with the balancer, airflow readings recorded, O&M manuals assembled and warranty registered in your name before we leave the roof.
- Balance report
- O&M manuals
- Warranty registration
The full system, priced up front.
Every EXD proposal starts with a close read of the venting system the project needs. We price every part, accessory and support it takes to install it. Some bids come in lower because pieces are missing, and those pieces come back later as change orders. Ours don't leave that gap.
- Built from the venting design, not a parts list.
- Every component, accessory and support needed for installation is included.
- No change orders for parts that should have been there from the start.