All Projects
Commercial High-Rise · Penthouse Boilers · San Francisco, CA

SF Embarcadero St. Project

Two common flues, two roof-mounted TDF fans, and EBC31 modulating controls, routed around mechanical equipment and a 10′ concrete parapet.

Location
Embarcadero, San Francisco, CA
Complex
Large commercial office complex
Appliances
(6) AERCO BMK 5.0 condensing boilers
Configuration
Two banks of three on common flues
Draft Fans
(2) Enervex TDF, vertically stand-mounted on roof
Controls
EBC31 Modulating Exhaust Controls

The Challenge

In 2020–21, a bank of six AERCO BMK 5.0 condensing boilers was installed in the penthouse of an Embarcadero high rise to replace the aging firetube boilers. The original design vented through vertical sheet metal panels on the sidewall. After commissioning, the steamy condensing-boiler exhaust resembled smoke billowing from the penthouse windows, prompting monthly calls to the fire department to extinguish what appeared to be a fire.

The Solution

In 2022–23, EXD (formerly ENERVEX Northern California) proposed reconfiguring the six boilers into two banks of three and routing the exhaust to the roof. Aerco’s venting guide and the tight penthouse boiler room ruled out individual flues per appliance, so the design called for coring through the ceiling/roof to establish two common flues, then navigating them around equipment and electrical panels. The mechanical level is enclosed by a ~10′ concrete parapet concealing cooling towers and other equipment, so the flues had to be carried one level higher to the building’s grated rooftop deck. TDF fans were installed vertically on contractor-fabricated stands with termination cones at the outlets, and draft is held in spec by EBC31 Modulating Exhaust Controls.

The Result

Six condensing boilers now common-vent through two roof-terminated flues with modulated mechanical draft. The exhaust discharges high above the parapet, no more apparent ‘smoke’ at the penthouse windows, and no more standing fire-department response to a condensing-boiler plume.

Gallery
Two Enervex TDF draft fans mounted vertically on contractor-fabricated stands with termination cones, rooftop above the parapet, Bay Bridge in the background.
Two Enervex TDF draft fans mounted vertically on contractor-fabricated stands with termination cones, rooftop above the parapet, Bay Bridge in the background.
The bank of six AERCO BMK 5.0 condensing boilers in the penthouse mechanical room, re-grouped into two banks of three on common flues.
The bank of six AERCO BMK 5.0 condensing boilers in the penthouse mechanical room, re-grouped into two banks of three on common flues.
Common flue routing through the penthouse, cored through the ceiling/roof and navigated around existing equipment and electrical panels.
Common flue routing through the penthouse, cored through the ceiling/roof and navigated around existing equipment and electrical panels.
Next Case Study

Bowling Alley Kitchen: VaughanAir DuraDuct KEX Grease Duct

Routing a 120′+ commercial kitchen grease duct to a fire-rated shaft, without losing 10 ft of ceiling to code-required slope.