Schematic to close-out.
Six steps. Time-boxed.
Engineering, supply and field verification under one workflow. Every step has a deliverable and a clock.
01
Same Day
Project Intake
Parameters in, vendor confirmation back. We capture program, fluid path, listed equipment, and schedule the same day they arrive.
Deliverables
- Project number
- Owner of record
- Confirmation memo
02
3–5 Days
Engineering Review
Sizing, pressure drop, fan curves, code alignment. Manufacturer-neutral options where the spec allows.
Deliverables
- Sizing calc
- Code memo
- Selection sheet
03
5 Days
Submittal Package
Stamped drawings, cut sheets, BOM, listed-equipment letter. Returned in editable form for owner review.
Deliverables
- Stamped drawings
- Cut sheets
- BOM
04
Tied to Install
Factory Release
Release scheduled against your install date. No early stock-and-store, no late surprises. Weekly status memo.
Deliverables
- Release memo
- Shipping window
- Insurance docs
05
Pre-Install + Punch
Field Verification
Pre-install survey, install QC checks, commissioning support. Field-verified before commissioning starts.
Deliverables
- Survey report
- QC checklist
- Punch list
06
10 Days
Close-Out
Balance reports, O&M manuals, warranty registration, annual recert calendar handed to the building.
Deliverables
- O&M binder
- Warranty pack
- Recert calendar